Bridge Park Fieldhouse Development

Bridgepark is a rapidly growing area on the east bank of the Scioto River in Dublin, Ohio. The proposed Fieldhouse development includes an arena and office space. The arena will seat approximately 5,000 people, which creates a high volume of trips into a high-density urban area. Finding a way to accommodate site traffic while also maintaining access to existing businesses and residential units is critical to successful approval and operation of the facility.

SERVICES PERFORMED

Parking Study – An event parking plan was developed in cooperation with Engineering and Law Enforcement from both the City of Columbus and the City of Dublin. The plan included temporary one-way streets, use of law enforcement, parking staff, variable message signing and traditional event signing.

Traffic Impact Study – Data collection and analysis of anticipated future traffic volumes, intersection capacity and final report.